prompt engineering
1.Instrument index(excel)
2.IO List(DCS/ESD & F&G)(excel)
3.Datasheets for Instruments and F&G devices(Including Instrument sizing calculations)(Excel)
4.Cable block diagram(DCS/ESD & F&G)(Autocad)
5.Cable schedule(DCS ,ESD & F&G)(excel)
6.Cable Routing drawings(Autocad)
7.Instrument hook up and installation drawings .(Autocad)
8.Instrument Loop and wiring drawings.(Autocad)
9.MR and TBE and vendor documents review for field instruments.(word and excel )
10.MTO(Excel)
Automation Engineering
1.DCS/ESD/F&G Configuration drawings(Autocad)
2.DCS /ESD/F&G Specification (Word)
3.MR and TBE for DCS /ESD and F&G (Word and Excel)
4.Vendor documents review for DCS ,ESD and F&G drawings (pdf and excel)
5.MTO(Excel)
SPI(shall be mutually discussed with client on license part and duration)
1.Wiring and loop drawings
2.Datasheets
3.Engineering sheets
4.IO list mapping
5.Instrument hookup drawings
6.Instrument sizing calculations
3D model SP3D or Aveva 3D (shall be mutually discussed with client on license part and duration)
1.Modelling of Instruments(remote instruments only) ,JBS,LCP like wellhead control panel and cable trays, Trenches
2.Modelling of F&G devices
3.Extraction of layouts and MTO from 3D model
WhatsApp us